Quellcodebibliothek Statistik Leitseite products/Sources/formale Sprachen/C/Firefox/intl/icu/source/i18n/   (Browser von der Mozilla Stiftung Version 136.0.1©)  Datei vom 10.2.2025 mit Größe 30 kB image not shown  

Quelle  hebrwcal.cpp   Sprache: C

 
// © 2016 and later: Unicode, Inc. and others.
// License & terms of use: http://www.unicode.org/copyright.html
/*
******************************************************************************
* Copyright (C) 2003-2016, International Business Machines Corporation
* and others. All Rights Reserved.
******************************************************************************
*
* File HEBRWCAL.CPP
*
* Modification History:
*
*   Date        Name        Description
*   12/03/2003  srl         ported from java HebrewCalendar
*****************************************************************************
*/


#include "hebrwcal.h"

#if !UCONFIG_NO_FORMATTING

#include "cmemory.h"
#include "cstring.h"
#include "umutex.h"
#include <float.h>
#include "gregoimp.h" // ClockMath
#include "astro.h" // CalendarCache
#include "uhash.h"
#include "ucln_in.h"

// Hebrew Calendar implementation

/**
* The absolute date, in milliseconds since 1/1/1970 AD, Gregorian,
* of the start of the Hebrew calendar.  In order to keep this calendar's
* time of day in sync with that of the Gregorian calendar, we use
* midnight, rather than sunset the day before.
*/

//static const double EPOCH_MILLIS = -180799862400000.; // 1/1/1 HY

static const int32_t LIMITS[UCAL_FIELD_COUNT][4] = {
    // Minimum  Greatest    Least  Maximum
    //           Minimum  Maximum
    {        0,        0,        0,        0}, // ERA
    { -5000000, -5000000,  5000000,  5000000}, // YEAR
    {        0,        0,       12,       12}, // MONTH
    {        1,        1,       51,       56}, // WEEK_OF_YEAR
    {/*N/A*/-1,/*N/A*/-1,/*N/A*/-1,/*N/A*/-1}, // WEEK_OF_MONTH
    {        1,        1,       29,       30}, // DAY_OF_MONTH
    {        1,        1,      353,      385}, // DAY_OF_YEAR
    {/*N/A*/-1,/*N/A*/-1,/*N/A*/-1,/*N/A*/-1}, // DAY_OF_WEEK
    {       -1,       -1,        5,        5}, // DAY_OF_WEEK_IN_MONTH
    {/*N/A*/-1,/*N/A*/-1,/*N/A*/-1,/*N/A*/-1}, // AM_PM
    {/*N/A*/-1,/*N/A*/-1,/*N/A*/-1,/*N/A*/-1}, // HOUR
    {/*N/A*/-1,/*N/A*/-1,/*N/A*/-1,/*N/A*/-1}, // HOUR_OF_DAY
    {/*N/A*/-1,/*N/A*/-1,/*N/A*/-1,/*N/A*/-1}, // MINUTE
    {/*N/A*/-1,/*N/A*/-1,/*N/A*/-1,/*N/A*/-1}, // SECOND
    {/*N/A*/-1,/*N/A*/-1,/*N/A*/-1,/*N/A*/-1}, // MILLISECOND
    {/*N/A*/-1,/*N/A*/-1,/*N/A*/-1,/*N/A*/-1}, // ZONE_OFFSET
    {/*N/A*/-1,/*N/A*/-1,/*N/A*/-1,/*N/A*/-1}, // DST_OFFSET
    { -5000000, -5000000,  5000000,  5000000}, // YEAR_WOY
    {/*N/A*/-1,/*N/A*/-1,/*N/A*/-1,/*N/A*/-1}, // DOW_LOCAL
    { -5000000, -5000000,  5000000,  5000000}, // EXTENDED_YEAR
    {/*N/A*/-1,/*N/A*/-1,/*N/A*/-1,/*N/A*/-1}, // JULIAN_DAY
    {/*N/A*/-1,/*N/A*/-1,/*N/A*/-1,/*N/A*/-1}, // MILLISECONDS_IN_DAY
    {/*N/A*/-1,/*N/A*/-1,/*N/A*/-1,/*N/A*/-1}, // IS_LEAP_MONTH
    {        0,        0,       11,       12}, // ORDINAL_MONTH
};

/**
* The lengths of the Hebrew months.  This is complicated, because there
* are three different types of years, or six if you count leap years.
* Due to the rules for postponing the start of the year to avoid having
* certain holidays fall on the sabbath, the year can end up being three
* different lengths, called "deficient", "normal", and "complete".
*/

static const int8_t MONTH_LENGTH[][3] = {
    // Deficient  Normal     Complete
    {   30,         30,         30     },           //Tishri
    {   29,         29,         30     },           //Heshvan
    {   29,         30,         30     },           //Kislev
    {   29,         29,         29     },           //Tevet
    {   30,         30,         30     },           //Shevat
    {   30,         30,         30     },           //Adar I (leap years only)
    {   29,         29,         29     },           //Adar
    {   30,         30,         30     },           //Nisan
    {   29,         29,         29     },           //Iyar
    {   30,         30,         30     },           //Sivan
    {   29,         29,         29     },           //Tammuz
    {   30,         30,         30     },           //Av
    {   29,         29,         29     },           //Elul
};

/**
* The cumulative # of days to the end of each month in a non-leap year
* Although this can be calculated from the MONTH_LENGTH table,
* keeping it around separately makes some calculations a lot faster
*/


static const int16_t MONTH_START[][3] = {
    // Deficient  Normal     Complete
    {    0,          0,          0  },          // (placeholder)
    {   30,         30,         30  },          // Tishri
    {   59,         59,         60  },          // Heshvan
    {   88,         89,         90  },          // Kislev
    {  117,        118,        119  },          // Tevet
    {  147,        148,        149  },          // Shevat
    {  147,        148,        149  },          // (Adar I placeholder)
    {  176,        177,        178  },          // Adar
    {  206,        207,        208  },          // Nisan
    {  235,        236,        237  },          // Iyar
    {  265,        266,        267  },          // Sivan
    {  294,        295,        296  },          // Tammuz
    {  324,        325,        326  },          // Av
    {  353,        354,        355  },          // Elul
};

/**
* The cumulative # of days to the end of each month in a leap year
*/

static const int16_t  LEAP_MONTH_START[][3] = {
    // Deficient  Normal     Complete
    {    0,          0,          0  },          // (placeholder)
    {   30,         30,         30  },          // Tishri
    {   59,         59,         60  },          // Heshvan
    {   88,         89,         90  },          // Kislev
    {  117,        118,        119  },          // Tevet
    {  147,        148,        149  },          // Shevat
    {  177,        178,        179  },          // Adar I
    {  206,        207,        208  },          // Adar II
    {  236,        237,        238  },          // Nisan
    {  265,        266,        267  },          // Iyar
    {  295,        296,        297  },          // Sivan
    {  324,        325,        326  },          // Tammuz
    {  354,        355,        356  },          // Av
    {  383,        384,        385  },          // Elul
};

// There are 235 months in 19 years cycle.
static const int32_t MONTHS_IN_CYCLE = 235;
static const int32_t YEARS_IN_CYCLE = 19;

static icu::CalendarCache *gCache =  nullptr;

U_CDECL_BEGIN
static UBool calendar_hebrew_cleanup() {
    delete gCache;
    gCache = nullptr;
    return true;
}
U_CDECL_END

U_NAMESPACE_BEGIN
//-------------------------------------------------------------------------
// Constructors...
//-------------------------------------------------------------------------

/**
* Constructs a default <code>HebrewCalendar</code> using the current time
* in the default time zone with the default locale.
* @internal
*/

HebrewCalendar::HebrewCalendar(const Locale& aLocale, UErrorCode& success)
:   Calendar(TimeZone::forLocaleOrDefault(aLocale), aLocale, success)

{
    setTimeInMillis(getNow(), success); // Call this again now that the vtable is set up properly.
}


HebrewCalendar::~HebrewCalendar() {
}

const char *HebrewCalendar::getType() const {
    return "hebrew";
}

HebrewCalendar* HebrewCalendar::clone() const {
    return new HebrewCalendar(*this);
}

HebrewCalendar::HebrewCalendar(const HebrewCalendar& other) : Calendar(other) {
}


//-------------------------------------------------------------------------
// Rolling and adding functions overridden from Calendar
//
// These methods call through to the default implementation in IBMCalendar
// for most of the fields and only handle the unusual ones themselves.
//-------------------------------------------------------------------------

/**
* Add a signed amount to a specified field, using this calendar's rules.
* For example, to add three days to the current date, you can call
* <code>add(Calendar.DATE, 3)</code>. 
* <p>
* When adding to certain fields, the values of other fields may conflict and
* need to be changed.  For example, when adding one to the {@link #MONTH MONTH} field
* for the date "30 Av 5758", the {@link #DAY_OF_MONTH DAY_OF_MONTH} field
* must be adjusted so that the result is "29 Elul 5758" rather than the invalid
* "30 Elul 5758".
* <p>
* This method is able to add to
* all fields except for {@link #ERA ERA}, {@link #DST_OFFSET DST_OFFSET},
* and {@link #ZONE_OFFSET ZONE_OFFSET}.
* <p>
* <b>Note:</b> You should always use {@link #roll roll} and add rather
* than attempting to perform arithmetic operations directly on the fields
* of a <tt>HebrewCalendar</tt>.  Since the {@link #MONTH MONTH} field behaves
* discontinuously in non-leap years, simple arithmetic can give invalid results.
* <p>
* @param field     the time field.
* @param amount    the amount to add to the field.
*
* @exception   IllegalArgumentException if the field is invalid or refers
*              to a field that cannot be handled by this method.
* @internal
*/

void HebrewCalendar::add(UCalendarDateFields field, int32_t amount, UErrorCode& status)
{
    if(U_FAILURE(status)) {
        return;
    }
    switch (field) {
  case UCAL_MONTH:
  case UCAL_ORDINAL_MONTH:
      {
          // We can't just do a set(MONTH, get(MONTH) + amount).  The
          // reason is ADAR_1.  Suppose amount is +2 and we land in
          // ADAR_1 -- then we have to bump to ADAR_2 aka ADAR.  But
          // if amount is -2 and we land in ADAR_1, then we have to
          // bump the other way -- down to SHEVAT.  - Alan 11/00
          int64_t month = get(UCAL_MONTH, status);
          int32_t year = get(UCAL_YEAR, status);
          UBool acrossAdar1;
          if (amount > 0) {
              acrossAdar1 = (month < ADAR_1); // started before ADAR_1?
              month += amount;
              // We know there are total 235 months in every 19 years. To speed
              // up the iteration, we first fast forward in the multiple of 235
              // months for 19 years before the iteration which check the leap year.
              if (month >= MONTHS_IN_CYCLE) {
                  if (uprv_add32_overflow(year, (month / MONTHS_IN_CYCLE) * YEARS_IN_CYCLE, &year)) {
                      status = U_ILLEGAL_ARGUMENT_ERROR;
                      return;
                  }
                  month %= MONTHS_IN_CYCLE;
              }

              for (;;) {
                  if (acrossAdar1 && month>=ADAR_1 && !isLeapYear(year)) {
                      ++month;
                  }
                  if (month <= ELUL) {
                      break;
                  }
                  month -= ELUL+1;
                  ++year;
                  acrossAdar1 = true;
              }
          } else {
              acrossAdar1 = (month > ADAR_1); // started after ADAR_1?
              month += amount;
              // We know there are total 235 months in every 19 years. To speed
              // up the iteration, we first fast forward in the multiple of 235
              // months for 19 years before the iteration which check the leap year.
              if (month <= -MONTHS_IN_CYCLE) {
                  if (uprv_add32_overflow(year, (month / MONTHS_IN_CYCLE) * YEARS_IN_CYCLE, &year)) {
                      status = U_ILLEGAL_ARGUMENT_ERROR;
                      return;
                  }
                  month %= MONTHS_IN_CYCLE;
              }
              for (;;) {
                  if (acrossAdar1 && month<=ADAR_1 && !isLeapYear(year)) {
                      --month;
                  }
                  if (month >= 0) {
                      break;
                  }
                  month += ELUL+1;
                  --year;
                  acrossAdar1 = true;
              }
          }
          set(UCAL_MONTH, month);
          set(UCAL_YEAR, year);
          pinField(UCAL_DAY_OF_MONTH, status);
          break;
      }

  default:
      Calendar::add(field, amount, status);
      break;
    }
}

/**
* @deprecated ICU 2.6 use UCalendarDateFields instead of EDateFields
*/

void HebrewCalendar::add(EDateFields field, int32_t amount, UErrorCode& status)
{
    add(static_cast<UCalendarDateFields>(field), amount, status);
}

namespace {

int32_t monthsInYear(int32_t year);

}  // namespace

/**
* Rolls (up/down) a specified amount time on the given field.  For
* example, to roll the current date up by three days, you can call
* <code>roll(Calendar.DATE, 3)</code>.  If the
* field is rolled past its maximum allowable value, it will "wrap" back
* to its minimum and continue rolling.  
* For example, calling <code>roll(Calendar.DATE, 10)</code>
* on a Hebrew calendar set to "25 Av 5758" will result in the date "5 Av 5758".
* <p>
* When rolling certain fields, the values of other fields may conflict and
* need to be changed.  For example, when rolling the {@link #MONTH MONTH} field
* upward by one for the date "30 Av 5758", the {@link #DAY_OF_MONTH DAY_OF_MONTH} field
* must be adjusted so that the result is "29 Elul 5758" rather than the invalid
* "30 Elul".
* <p>
* This method is able to roll
* all fields except for {@link #ERA ERA}, {@link #DST_OFFSET DST_OFFSET},
* and {@link #ZONE_OFFSET ZONE_OFFSET}.  Subclasses may, of course, add support for
* additional fields in their overrides of <code>roll</code>.
* <p>
* <b>Note:</b> You should always use roll and {@link #add add} rather
* than attempting to perform arithmetic operations directly on the fields
* of a <tt>HebrewCalendar</tt>.  Since the {@link #MONTH MONTH} field behaves
* discontinuously in non-leap years, simple arithmetic can give invalid results.
* <p>
* @param field     the time field.
* @param amount    the amount by which the field should be rolled.
*
* @exception   IllegalArgumentException if the field is invalid or refers
*              to a field that cannot be handled by this method.
* @internal
*/

void HebrewCalendar::roll(UCalendarDateFields field, int32_t amount, UErrorCode& status)
{
    if(U_FAILURE(status)) {
        return;
    }
    switch (field) {
  case UCAL_MONTH:
  case UCAL_ORDINAL_MONTH:
      {
          int32_t month = get(UCAL_MONTH, status);
          int32_t year = get(UCAL_YEAR, status);

          UBool leapYear = isLeapYear(year);
          int32_t yearLength = monthsInYear(year);
          int32_t newMonth = month + (amount % yearLength);
          //
          // If it's not a leap year and we're rolling past the missing month
          // of ADAR_1, we need to roll an extra month to make up for it.
          //
          if (!leapYear) {
              if (amount > 0 && month < ADAR_1 && newMonth >= ADAR_1) {
                  newMonth++;
              } else if (amount < 0 && month > ADAR_1 && newMonth <= ADAR_1) {
                  newMonth--;
              }
          }
          set(UCAL_MONTH, (newMonth + 13) % 13);
          pinField(UCAL_DAY_OF_MONTH, status);
          return;
      }
  default:
      Calendar::roll(field, amount, status);
    }
}

void HebrewCalendar::roll(EDateFields field, int32_t amount, UErrorCode& status) {
    roll(static_cast<UCalendarDateFields>(field), amount, status);
}

//-------------------------------------------------------------------------
// Support methods
//-------------------------------------------------------------------------

// Hebrew date calculations are performed in terms of days, hours, and
// "parts" (or halakim), which are 1/1080 of an hour, or 3 1/3 seconds.
static const int32_t HOUR_PARTS = 1080;
static const int32_t DAY_PARTS  = 24*HOUR_PARTS;

// An approximate value for the length of a lunar month.
// It is used to calculate the approximate year and month of a given
// absolute date.
static const int32_t  MONTH_DAYS = 29;
static const int32_t MONTH_FRACT = 12*HOUR_PARTS + 793;
static const int32_t MONTH_PARTS = MONTH_DAYS*DAY_PARTS + MONTH_FRACT;

// The time of the new moon (in parts) on 1 Tishri, year 1 (the epoch)
// counting from noon on the day before.  BAHARAD is an abbreviation of
// Bet (Monday), Hey (5 hours from sunset), Resh-Daled (204).
static const int32_t BAHARAD = 11*HOUR_PARTS + 204;

namespace {

/**
* Finds the day # of the first day in the given Hebrew year.
* To do this, we want to calculate the time of the Tishri 1 new moon
* in that year.
* <p>
* The algorithm here is similar to ones described in a number of
* references, including:
* <ul>
* <li>"Calendrical Calculations", by Nachum Dershowitz & Edward Reingold,
*     Cambridge University Press, 1997, pages 85-91.
*
* <li>Hebrew Calendar Science and Myths,
*     <a href="http://www.geocities.com/Athens/1584/">
*     http://www.geocities.com/Athens/1584/</a>
*
* <li>The Calendar FAQ,
*      <a href="http://www.faqs.org/faqs/calendars/faq/">
*      http://www.faqs.org/faqs/calendars/faq/</a>
* </ul>
*/

int32_t startOfYear(int32_t year, UErrorCode &status)
{
    ucln_i18n_registerCleanup(UCLN_I18N_HEBREW_CALENDAR, calendar_hebrew_cleanup);
    int64_t day = CalendarCache::get(&gCache, year, status);
    if(U_FAILURE(status)) {
        return 0;
    }

    if (day == 0) {
        // # of months before year
        int64_t months = ClockMath::floorDivideInt64(
            (235LL * static_cast<int64_t>(year) - 234LL), 19LL);

        int64_t frac = months * MONTH_FRACT + BAHARAD;  // Fractional part of day #
        day  = months * 29LL + frac / DAY_PARTS;        // Whole # part of calculation
        frac = frac % DAY_PARTS;                        // Time of day

        int32_t wd = (day % 7);                        // Day of week (0 == Monday)

        if (wd == 2 || wd == 4 || wd == 6) {
            // If the 1st is on Sun, Wed, or Fri, postpone to the next day
            day += 1;
            wd = (day % 7);
        }
        if (wd == 1 && frac > 15*HOUR_PARTS+204 && !HebrewCalendar::isLeapYear(year) ) {
            // If the new moon falls after 3:11:20am (15h204p from the previous noon)
            // on a Tuesday and it is not a leap year, postpone by 2 days.
            // This prevents 356-day years.
            day += 2;
        }
        else if (wd == 0 && frac > 21*HOUR_PARTS+589 && HebrewCalendar::isLeapYear(year-1) ) {
            // If the new moon falls after 9:32:43 1/3am (21h589p from yesterday noon)
            // on a Monday and *last* year was a leap year, postpone by 1 day.
            // Prevents 382-day years.
            day += 1;
        }
        if (day > INT32_MAX || day < INT32_MIN) {
            status = U_ILLEGAL_ARGUMENT_ERROR;
            return 0;
        }
        CalendarCache::put(&gCache, year, static_cast<int32_t>(day), status);
    }
    // Out of range value is alread rejected before putting into cache.
    U_ASSERT(INT32_MIN <= day  &&  day <= INT32_MAX);
    return day;
}

int32_t daysInYear(int32_t eyear, UErrorCode& status) {
    if (U_FAILURE(status)) {
       return 0;
    }
    return startOfYear(eyear+1, status) - startOfYear(eyear, status);
}

/**
* Returns the the type of a given year.
*  0   "Deficient" year with 353 or 383 days
*  1   "Normal"    year with 354 or 384 days
*  2   "Complete"  year with 355 or 385 days
*/

int32_t yearType(int32_t year, UErrorCode& status)
{
    if (U_FAILURE(status)) {
        return 0;
    }
    int32_t yearLength = daysInYear(year, status);
    if (U_FAILURE(status)) {
        return 0;
    }

    if (yearLength > 380) {
        yearLength -= 30;        // Subtract length of leap month.
    }

    int type = 0;

    switch (yearLength) {
  case 353:
      type = 0; break;
  case 354:
      type = 1; break;
  case 355:
      type = 2; break;
  default:
      //throw new RuntimeException("Illegal year length " + yearLength + " in year " + year);
      type = 1;
    }
    return type;
}

}  // namespace
   //
/**
* Determine whether a given Hebrew year is a leap year
*
* The rule here is that if (year % 19) == 0, 3, 6, 8, 11, 14, or 17.
* The formula below performs the same test, believe it or not.
*/

UBool HebrewCalendar::isLeapYear(int32_t year) {
    //return (year * 12 + 17) % 19 >= 12;
    int64_t x = (year*12LL + 17) % YEARS_IN_CYCLE;
    return x >= ((x < 0) ? -7 : 12);
}

namespace{

int32_t monthsInYear(int32_t year) {
    return HebrewCalendar::isLeapYear(year) ? 13 : 12;
}

}  // namespace

//-------------------------------------------------------------------------
// Calendar framework
//-------------------------------------------------------------------------

/**
* @internal
*/

int32_t HebrewCalendar::handleGetLimit(UCalendarDateFields field, ELimitType limitType) const {
    return LIMITS[field][limitType];
}

/**
* Returns the length of the given month in the given year
* @internal
*/

int32_t HebrewCalendar::handleGetMonthLength(int32_t extendedYear, int32_t month, UErrorCode& status) const {
    if(U_FAILURE(status)) {
        return 0;
    }
    // Resolve out-of-range months.  This is necessary in order to
    // obtain the correct year.  We correct to
    // a 12- or 13-month year (add/subtract 12 or 13, depending
    // on the year) but since we _always_ number from 0..12, and
    // the leap year determines whether or not month 5 (Adar 1)
    // is present, we allow 0..12 in any given year.
    while (month < 0) {
        month += monthsInYear(--extendedYear);
    }
    // Careful: allow 0..12 in all years
    while (month > 12) {
        month -= monthsInYear(extendedYear++);
    }

    switch (month) {
    case HESHVAN:
    case KISLEV:
      {
          // These two month lengths can vary
          int32_t type = yearType(extendedYear, status);
          if(U_FAILURE(status)) {
              return 0;
          }
          return MONTH_LENGTH[month][type];
      }

    default:
      // The rest are a fixed length
      return MONTH_LENGTH[month][0];
    }
}

/**
* Returns the number of days in the given Hebrew year
* @internal
*/

int32_t HebrewCalendar::handleGetYearLength(int32_t eyear) const {
    UErrorCode status = U_ZERO_ERROR;
    int32_t len = daysInYear(eyear, status);
    if (U_FAILURE(status)) {
        return 12;
    }
    return len;
}

void HebrewCalendar::validateField(UCalendarDateFields field, UErrorCode &status) {
    if ((field == UCAL_MONTH || field == UCAL_ORDINAL_MONTH)
        && !isLeapYear(handleGetExtendedYear(status)) && internalGetMonth(status) == ADAR_1) {
        if (U_FAILURE(status)) {
            return;
        }
        status = U_ILLEGAL_ARGUMENT_ERROR;
        return;
    }
    Calendar::validateField(field, status);
}
//-------------------------------------------------------------------------
// Functions for converting from milliseconds to field values
//-------------------------------------------------------------------------

/**
* Subclasses may override this method to compute several fields
* specific to each calendar system.  These are:
*
* <ul><li>ERA
* <li>YEAR
* <li>MONTH
* <li>DAY_OF_MONTH
* <li>DAY_OF_YEAR
* <li>EXTENDED_YEAR</ul>

* Subclasses can refer to the DAY_OF_WEEK and DOW_LOCAL fields,
* which will be set when this method is called.  Subclasses can
* also call the getGregorianXxx() methods to obtain Gregorian
* calendar equivalents for the given Julian day.
*
* <p>In addition, subclasses should compute any subclass-specific
* fields, that is, fields from BASE_FIELD_COUNT to
* getFieldCount() - 1.
* @internal
*/

void HebrewCalendar::handleComputeFields(int32_t julianDay, UErrorCode &status) {
    if (U_FAILURE(status)) {
        return;
    }
    int32_t d = julianDay - 347997;
    double m = ClockMath::floorDivide((d * static_cast<double>(DAY_PARTS)), static_cast<double>(MONTH_PARTS)); // Months (approx)
    int32_t year = static_cast<int32_t>(ClockMath::floorDivide((19. * m + 234.), 235.) + 1.); // Years (approx)
    int32_t ys  = startOfYear(year, status);                   // 1st day of year
    if (U_FAILURE(status)) {
        return;
    }
    int32_t dayOfYear = (d - ys);

    // Because of the postponement rules, it's possible to guess wrong.  Fix it.
    while (dayOfYear < 1) {
        year--;
        ys  = startOfYear(year, status);
        if (U_FAILURE(status)) {
            return;
        }
        dayOfYear = (d - ys);
    }

    // Now figure out which month we're in, and the date within that month
    int32_t type = yearType(year, status);
    if (U_FAILURE(status)) {
        return;
    }
    UBool isLeap = isLeapYear(year);

    int32_t month = 0;
    int32_t momax = UPRV_LENGTHOF(MONTH_START);
    while (month < momax &&
           dayOfYear > (  isLeap ? LEAP_MONTH_START[month][type] : MONTH_START[month][type] ) ) {
        month++;
    }
    if (month >= momax || month<=0) {
        // TODO: I found dayOfYear could be out of range when
        // a large value is set to julianDay.  I patched startOfYear
        // to reduce the chace, but it could be still reproduced either
        // by startOfYear or other places.  For now, we check
        // the month is in valid range to avoid out of array index
        // access problem here.  However, we need to carefully review
        // the calendar implementation to check the extreme limit of
        // each calendar field and the code works well for any values
        // in the valid value range.  -yoshito
        status = U_ILLEGAL_ARGUMENT_ERROR;
        return;
    }
    month--;
    int dayOfMonth = dayOfYear - (isLeap ? LEAP_MONTH_START[month][type] : MONTH_START[month][type]);

    internalSet(UCAL_ERA, 0);
    // Check out of bound year
    int32_t min_year = handleGetLimit(UCAL_EXTENDED_YEAR, UCAL_LIMIT_MINIMUM);
    if (year < min_year) {
        if (!isLenient()) {
            status = U_ILLEGAL_ARGUMENT_ERROR;
            return;
        }
        year = min_year;
    }
    int32_t max_year = handleGetLimit(UCAL_EXTENDED_YEAR, UCAL_LIMIT_MAXIMUM);
    if (max_year < year) {
        if (!isLenient()) {
            status = U_ILLEGAL_ARGUMENT_ERROR;
            return;
        }
        year = max_year;
    }
    internalSet(UCAL_YEAR, year);
    internalSet(UCAL_EXTENDED_YEAR, year);
    int32_t ordinal_month = month;
    if (!isLeap && ordinal_month > ADAR_1) {
        ordinal_month--;
    }
    internalSet(UCAL_ORDINAL_MONTH, ordinal_month);
    internalSet(UCAL_MONTH, month);
    internalSet(UCAL_DAY_OF_MONTH, dayOfMonth);
    internalSet(UCAL_DAY_OF_YEAR, dayOfYear);
}

//-------------------------------------------------------------------------
// Functions for converting from field values to milliseconds
//-------------------------------------------------------------------------

/**
* @internal
*/

int32_t HebrewCalendar::handleGetExtendedYear(UErrorCode& status ) {
    if (U_FAILURE(status)) {
        return 0;
    }
    if (newerField(UCAL_EXTENDED_YEAR, UCAL_YEAR) == UCAL_EXTENDED_YEAR) {
        return internalGet(UCAL_EXTENDED_YEAR, 1); // Default to year 1
    }
    return internalGet(UCAL_YEAR, 1); // Default to year 1
}

/**
* Return JD of start of given month/year.
* @internal
*/

int64_t HebrewCalendar::handleComputeMonthStart(
    int32_t eyear, int32_t month, UBool /*useMonth*/, UErrorCode& status) const {
    if (U_FAILURE(status)) {
        return 0;
    }
    // Resolve out-of-range months.  This is necessary in order to
    // obtain the correct year.  We correct to
    // a 12- or 13-month year (add/subtract 12 or 13, depending
    // on the year) but since we _always_ number from 0..12, and
    // the leap year determines whether or not month 5 (Adar 1)
    // is present, we allow 0..12 in any given year.

    // The month could be in large value, we first roll 235 months to 19 years
    // before the while loop.
    if (month <= -MONTHS_IN_CYCLE || month >= MONTHS_IN_CYCLE) {
        if (uprv_add32_overflow(eyear, (month / MONTHS_IN_CYCLE) * YEARS_IN_CYCLE, &eyear)) {
            status = U_ILLEGAL_ARGUMENT_ERROR;
            return 0;
        }
        month %= MONTHS_IN_CYCLE;
    }
    while (month < 0) {
        if (uprv_add32_overflow(eyear, -1, &eyear) ||
            uprv_add32_overflow(month, monthsInYear(eyear), &month)) {
            status = U_ILLEGAL_ARGUMENT_ERROR;
            return 0;
        }
    }
    // Careful: allow 0..12 in all years
    while (month > 12) {
        if (uprv_add32_overflow(month, -monthsInYear(eyear), &month) ||
            uprv_add32_overflow(eyear, 1, &eyear)) {
            status = U_ILLEGAL_ARGUMENT_ERROR;
            return 0;
        }
    }

    int64_t day = startOfYear(eyear, status);

    if(U_FAILURE(status)) {
        return 0;
    }

    if (month != 0) {
        int32_t type = yearType(eyear, status);
        if (U_FAILURE(status)) {
            return 0;
        }
        if (isLeapYear(eyear)) {
            day += LEAP_MONTH_START[month][type];
        } else {
            day += MONTH_START[month][type];
        }
    }

    return day + 347997LL;
}

constexpr uint32_t kHebrewRelatedYearDiff = -3760;

int32_t HebrewCalendar::getRelatedYear(UErrorCode &status) const
{
    int32_t year = get(UCAL_EXTENDED_YEAR, status);
    if (U_FAILURE(status)) {
        return 0;
    }
    return year + kHebrewRelatedYearDiff;
}

void HebrewCalendar::setRelatedYear(int32_t year)
{
    // set extended year
    set(UCAL_EXTENDED_YEAR, year - kHebrewRelatedYearDiff);
}

IMPL_SYSTEM_DEFAULT_CENTURY(HebrewCalendar, "@calendar=hebrew")

bool HebrewCalendar::inTemporalLeapYear(UErrorCode& status) const {
    if (U_FAILURE(status)) {
        return false;
    }
    int32_t eyear = get(UCAL_EXTENDED_YEAR, status);
    if (U_FAILURE(status)) {
        return false;
    }
    return isLeapYear(eyear);
}

static const char * const gTemporalMonthCodesForHebrew[] = {
    "M01""M02""M03""M04""M05""M05L""M06",
    "M07""M08""M09""M10""M11""M12", nullptr
};

const char* HebrewCalendar::getTemporalMonthCode(UErrorCode& status) const {
    int32_t month = get(UCAL_MONTH, status);
    if (U_FAILURE(status)) {
        return nullptr;
    }
    return gTemporalMonthCodesForHebrew[month];
}

void HebrewCalendar::setTemporalMonthCode(const char* code, UErrorCode& status )
{
    if (U_FAILURE(status)) {
        return;
    }
    int32_t len = static_cast<int32_t>(uprv_strlen(code));
    if (len == 3 || len == 4) {
        for (int m = 0; gTemporalMonthCodesForHebrew[m] != nullptr; m++) {
            if (uprv_strcmp(code, gTemporalMonthCodesForHebrew[m]) == 0) {
                set(UCAL_MONTH, m);
                return;
            }
        }
    }
    status = U_ILLEGAL_ARGUMENT_ERROR;
}

int32_t HebrewCalendar::internalGetMonth(UErrorCode& status) const {
    if (U_FAILURE(status)) {
        return 0;
    }
    if (resolveFields(kMonthPrecedence) == UCAL_ORDINAL_MONTH) {
        int32_t ordinalMonth = internalGet(UCAL_ORDINAL_MONTH);
        HebrewCalendar* nonConstThis = const_cast<HebrewCalendar*>(this); // cast away const

        int32_t year = nonConstThis->handleGetExtendedYear(status);
        if (U_FAILURE(status)) {
            return 0;
        }
        if (isLeapYear(year) || ordinalMonth <= ADAR_1) {
            return ordinalMonth;
        }
        if (!uprv_add32_overflow(ordinalMonth, 1, &ordinalMonth)) {
            return ordinalMonth;
        }
    }
    return Calendar::internalGetMonth(status);
}

UOBJECT_DEFINE_RTTI_IMPLEMENTATION(HebrewCalendar)

U_NAMESPACE_END

#endif // UCONFIG_NO_FORMATTING


Messung V0.5
C=78 H=93 G=85

¤ Dauer der Verarbeitung: 0.14 Sekunden  (vorverarbeitet)  ¤

*© Formatika GbR, Deutschland






Wurzel

Suchen

Beweissystem der NASA

Beweissystem Isabelle

NIST Cobol Testsuite

Cephes Mathematical Library

Wiener Entwicklungsmethode

Haftungshinweis

Die Informationen auf dieser Webseite wurden nach bestem Wissen sorgfältig zusammengestellt. Es wird jedoch weder Vollständigkeit, noch Richtigkeit, noch Qualität der bereit gestellten Informationen zugesichert.

Bemerkung:

Die farbliche Syntaxdarstellung und die Messung sind noch experimentell.