// Copyright 2019 Google Inc. All rights reserved.
//
// Licensed under the Apache License, Version 2.0 (the "License");
// you may not use this file except in compliance with the License.
// You may obtain a copy of the License at
//
//     http://www.apache.org/licenses/LICENSE-2.0
//
// Unless required by applicable law or agreed to in writing, software
// distributed under the License is distributed on an "AS IS" BASIS,
// WITHOUT WARRANTIES OR CONDITIONS OF ANY KIND, either express or implied.
// See the License for the specific language governing permissions and
// limitations under the License.

package status

import (
 "android/soong/ui/metrics"

 soong_metrics_proto "android/soong/ui/metrics/metrics_proto"
 "time"

 "google.golang.org/protobuf/proto"
)

func NewCriticalPath() *CriticalPath {
 return &CriticalPath{
  running: make(map[*Action]time.Time),
  nodes:   make(map[string]*node),
  clock:   osClock{},
 }
}

type CriticalPath struct {
 nodes   map[string]*node
 running map[*Action]time.Time

 start, end time.Time

 clock clock
}

type clock interface {
 Now() time.Time
}

type osClock struct{}

func (osClock) Now() time.Time { return time.Now() }

// A critical path node stores the critical path (the minimum time to build the node and all of its dependencies given
// perfect parallelism) for an node.
type node struct {
 action             *Action
 cumulativeDuration time.Duration
 duration           time.Duration
 input              *node
}

func (cp *CriticalPath) StartAction(action *Action) {
 start := cp.clock.Now()
 if cp.start.IsZero() {
  cp.start = start
 }
 cp.running[action] = start
}

func (cp *CriticalPath) FinishAction(action *Action) {
 if start, ok := cp.running[action]; ok {
  delete(cp.running, action)

  // Determine the input to this edge with the longest cumulative duration
  var criticalPathInput *node
  for _, input := range action.Inputs {
   if x := cp.nodes[input]; x != nil {
    if criticalPathInput == nil || x.cumulativeDuration > criticalPathInput.cumulativeDuration {
     criticalPathInput = x
    }
   }
  }

  end := cp.clock.Now()
  duration := end.Sub(start)

  cumulativeDuration := duration
  if criticalPathInput != nil {
   cumulativeDuration += criticalPathInput.cumulativeDuration
  }

  node := &node{
   action:             action,
   cumulativeDuration: cumulativeDuration,
   duration:           duration,
   input:              criticalPathInput,
  }

  for _, output := range action.Outputs {
   cp.nodes[output] = node
  }

  cp.end = end
 }
}

func (cp *CriticalPath) criticalPath() (path []*node, elapsedTime time.Duration, criticalTime time.Duration) {
 var max *node

 // Find the node with the longest critical path
 for _, node := range cp.nodes {
  if max == nil || node.cumulativeDuration > max.cumulativeDuration {
   max = node
  }
 }

 node := max
 for node != nil {
  path = append(path, node)
  node = node.input
 }
 if len(path) > 0 {
  // Log the critical path to the verbose log
  criticalTime = path[0].cumulativeDuration
  if !cp.start.IsZero() {
   elapsedTime = cp.end.Sub(cp.start)
  }
 }
 return
}

func (cp *CriticalPath) longRunningJobs() (nodes []*node) {
 threshold := time.Second * 30
 for _, node := range cp.nodes {
  if node != nil && node.duration > threshold {
   nodes = append(nodes, node)
  }
 }
 return
}

func addJobInfos(jobInfos *[]*soong_metrics_proto.JobInfo, sources []*node) {
 for _, job := range sources {
  jobInfo := soong_metrics_proto.JobInfo{}
  jobInfo.ElapsedTimeMicros = proto.Uint64(uint64(job.duration.Microseconds()))
  jobInfo.JobDescription = &job.action.Description
  *jobInfos = append(*jobInfos, &jobInfo)
 }
}

func (cp *CriticalPath) WriteToMetrics(met *metrics.Metrics) {
 criticalPathInfo := soong_metrics_proto.CriticalPathInfo{}
 path, elapsedTime, criticalTime := cp.criticalPath()
 criticalPathInfo.ElapsedTimeMicros = proto.Uint64(uint64(elapsedTime.Microseconds()))
 criticalPathInfo.CriticalPathTimeMicros = proto.Uint64(uint64(criticalTime.Microseconds()))
 addJobInfos(&criticalPathInfo.LongRunningJobs, cp.longRunningJobs())
 addJobInfos(&criticalPathInfo.CriticalPath, path)
 met.SetCriticalPathInfo(&criticalPathInfo)
}

¤ Dauer der Verarbeitung: 0.1 Sekunden  (vorverarbeitet am  2026-11-04) ¤

*© Formatika GbR, Deutschland






Wurzel

Suchen

PVS Prover

Isabelle Prover


Cephes Mathematical Library

Vienna Development Method

Haftungshinweis

Die Informationen auf dieser Webseite wurden nach bestem Wissen sorgfältig zusammengestellt. Es wird jedoch weder Vollständigkeit, noch Richtigkeit, noch Qualität der bereit gestellten Informationen zugesichert.

Bemerkung:

Die farbliche Syntaxdarstellung und die Messung sind noch experimentell.






                                                                                                                                                                                                                                                                                                                                                                                                     


Neuigkeiten

     Aktuelles
     Motto des Tages

Open Source Software

     Quellcodebibliothek
     Eigene Quellcodes
     Fremde Quellcodes
     Suchen

Jenseits des Üblichen ....
    

Besucherstatistik

Besucherstatistik

Statistik
#Sources=1104857
#Domains=439459